
ACCESS:
- Highway access 8 miles north from I-295 on Virginia State Route 5
- Rail access through adjoining csx line can be developed
- Barge berth on the James River with a 14' MLW draft petroleum pipeline access
- Petroleum products linkage to Colonial Pipeline

FACILITIES:
- 12 tanks, 415,000 barrels total capacity ranging in size from 12,000 gallons through 100,000 barrels. Tanks meet all emissions, spill control and inspection compliance standards.
- 2 truck racks, one a 2-bay automated rack with vapor recovery.

RESPONSIBLE CARE:
- Emergency response capabilities consistent with EPA and U.S.Coast Guard standards. On-site spill control capabilities enhanced by retained spill contractor.
- Employee training including spill drills meet all OSHA, EPA and U.S.Coast Guard requirements.
- Risk Management Plan in place and full compliance with state, local and federal requirements including monitoring of emission and effluent permit limits tracked in ISO 14001 format.

SPECIAL SERVICES:
- Corporate engineering office provides prompt and knowledgeable handling
of customer technical services requirements.
|